Fabrication and Installation both de-dusting filter bodies at new chemical plant
- Supply and Fabrication of Temporary Structure.
- Arrangement of scaffolding.
- Dismantling of existing filter body.
Delivered : 2019
Fabrication and Installation of 4 Nos. Overhead cranes
Under Construction
Delivered : 2019
Sandblasting and Epoxy Painting of Ball Mill at Newage Cables
- Sandblasting of Ball Mill, Epoxy Painting of Ball Mill, Writing and Drafting on Ball Mill
Delivered : 2018
Fabrication and Erection of Galvanizing Plant Shed
- Complete fabrication and erection of fabrication shed with consumables. (In Progress)
Delivered : 2018
Repair and Modification of 2 Nos. Insulated SS milk preservation tanks with agitator
- Removal of complete cladding sheets, insulation, Legs, Manhole, Agitator and all nozzles from tanks.
- Polishing: Complete Inside tank. And outside welding joints.
Delivered : 2017
Manufacturing of Cone Flanging
- Arrangements of all the parts of Flanging machine.
- Flanging of sample cone after complete manufacturing.
Delivered : 2016
Complete Welding of Galvanizing Plant Kettle
- Complete Welding of Kettle.
Delivered : 2016
Forming of 4 Nos. SS Dish Ends
Forming of 4 Nos. SS Dish Ends I.D 2600 x 12 mm Thk
Delivered : 2016