Fabrication and Installation both de-dusting filter bodies at new chemical plant
  • Supply and Fabrication of Temporary Structure.
  • Arrangement of scaffolding.
  • Dismantling of existing filter body.

 Delivered : 2019

Fabrication and Installation of 4 Nos. Overhead cranes
  • Under Construction

 Delivered : 2019

Sandblasting and Epoxy Painting of Ball Mill at Newage Cables
  • Sandblasting of Ball Mill, Epoxy Painting of Ball Mill, Writing and Drafting on Ball Mill

 Delivered : 2018

Fabrication and Erection of Galvanizing Plant Shed
  • Complete fabrication and erection of fabrication shed with consumables. (In Progress)

 Delivered : 2018

Repair and Modification of 2 Nos. Insulated SS milk preservation tanks with agitator
  • Removal of complete cladding sheets, insulation, Legs, Manhole, Agitator and all nozzles from tanks.
  • Polishing: Complete Inside tank. And outside welding joints.

 Delivered : 2017

Manufacturing of Cone Flanging
  • Arrangements of all the parts of Flanging machine.
  • Flanging of sample cone after complete manufacturing.

 Delivered : 2016

Complete Welding of Galvanizing Plant Kettle
  • Complete Welding of Kettle.

 Delivered : 2016

Forming of 4 Nos. SS Dish Ends
  • Forming of 4 Nos. SS Dish Ends I.D 2600 x 12 mm Thk

 Delivered : 2016